Heinen & Hopman employee
close
Would you like to visit our site in English?
Remember my choice
GoStay on this site
Möchten Sie unsere Website in Deutsch zu besuchen?
Erinnere dich an meine Wahl
GoBleiben Sie auf dieser Seite
당신은 한국어로 우리의 사이트를 방문 하시겠습니까?
선택 기억하기
가기Stay on this site
Doriți să vizitați site-ul nostru în limba română?
Amintiți-vă alegerea mea
MergeStay on this site
Sleipnir
Outside35°cHumidity80%
22oInside
Provided byHeinen & Hopman
Our mission is to ensure you the perfect climate indoors, regardless of the weather outside.

HVAC | Sleipnir

Heinen & Hopman will supply the major HVAC equipment for the world’s largest semi-submersible crane vessel, to be constructed by Sembcorp Marine. The vessel will be 220 meters in length, with a width of 102 meters. It will be deployed by Heerema Offshore Services for installation and decommissioning of major offshore facilities worldwide.

HVAC by H&H Singapore

Despite the challenging global environment faced by the oil and gas sector lately, Heinen & Hopman Singapore, together with the support of H&H Headquarters, has been awarded the contract to supply the Air Handling Units (AHU’s), Chilled Water Plant (CWP) and Provision Cooling Plant (PCP) for the world’s largest semi-submersible crane vessel.

System design conditions

The supplied HVAC equipment is based on the following design conditions:

Design Conditions Summer

Outside: 35˚C/80%RH
Supply air: 16˚C

Design Conditions Winter

Outside: -20˚C/35%RH
Supply air: 16˚C

Air Handling Units

A total of 22 Air Handling Units with associated control panels (14x Living Quarters + 8x Machinery Systems) will be installed. Most of the AHUs for the Living Quarters are equipped with a Heat Recovery Wheel to meet the energy saving demands.

Chilled Water Plant

A total of 6 chilled water systems (2x Living Quarters + 4x Machinery Systems) will be installed. Each chilled water system consists of 2 chillers, 2 VFD chilled water pumps, an expansion tank and a chemical injection tank. The chilled water plant is equipped with a variable primary flow system. Utilizing the variable flow system, the pumping energy can be significantly reduced. Special feature is that the waste cold recovery from the LNG evaporator is used to lower the temperature of the chilled water.

Provision Cooling Plant

Two Provision Cooling Plants (1x Cool rooms + 1x Freeze rooms) including the provision cooling cells with accessories will be installed with a total volume of 726 m3.

Classifications

All relevant systems will be installed in compliance with LRS, NMA, DSB, USPH, NIPH, Lloyds ECO-notation and Eurovent, where applicable. As a result, the systems are fully customized to meet the  stringent offshore requirements.

More information about our HVAC solutions?

It’s an honour to cooperate on this prestigious project. Don’t hesitate to get in touch for more information about our HVAC systems.

Contact H&H Singapore

Read more

Subsidiary
H&H Singapore
Shipyard
Sembcorp Marine
IMO No.
t.b.a.
Name Vessel
Sleipnir
Owner
Heerema Offshore Services
Delivery year
2018
Country of Delivery
Singapore
Vessel type
Construction Vessel
Length
220.0 m

All systems are fully customized to meet the stringent offshore requirements.

Eric Stoffelsen

Eric Stoffelsen

Eric Stoffelsen

- Sales Manager

Eric Stoffelsen

Eric Stoffelsen

- Sales Manager

Certification

iso9001.pngdnv-gl.pngrrr-2.pngbureau_veritas-2.pngrmrs-2.png
Stay updated

Subscribe to our newsletter

Close
Contact

All fields are required.

Get a quote for an HVAC system

File (optional)
Close
Can't find what you're looking for?

We probably offer a HVAC&R system that suits your specifc needs!