    OHVS Borkum Riffgrund 2
    Outside35°cHumidity80%
    22oInside
    Provided byHeinen & Hopman
    Our mission is to ensure you the perfect climate indoors, regardless of the weather outside.

    HVAC | OHVS Borkum Riffgrund 2

    We’re happy to announce that Heinen & Hopman received the order to fabricate and install the HVAC for Borkum Riffgrund 2 Offshore High Voltage Substation (OHVS). Borkum Riffgrund 2 is a German offshore wind farm.

    OHVS by HSM Offshore

    HSM offshore – a Dutch construction yard experienced in platform, module and jacket projects for the offshore oil & gas and renewables sectors – was awarded the EPC contract for the high voltage AC transformer platform. The Offshore Substation will collect the electrical energy from the offshore wind farm turbines, transform it to a higher voltage level and deliver the power to shore.

    ohvs-borkum-riffgrund.jpg

    Acceptable air quality and temperature

    Offshore substations require a controlled indoor climate to maintain the temperature, relative humidity and air quality within the design limits in order to ensure optimum operation of installed electrical and electronic equipment. By providing ventilation, heating, cooling and moisture control, acceptable air quality and temperature is achieved in all weather conditions. Indoor rooms will be kept at an 50 Pa overpressure in order to avoid infiltration and ingress of salt-particles, dust and saltwater aerosols.

    Robust systems

    Heinen & Hopman will supply the dehumidification system, the ventilation system (including natural ventilation), the heating & cooling system as well as the HVAC control systems. Robustness was one of the key requirements. High quality materials will be used to avoid corrosion and guarantee the 25 year lifetime of the platform. For example, only stainless steel ducting and piping will be used, as well as self-contained units with air cooled condenser coils made of titanium.

    Design conditions

    The following design conditions are considered:

    Summer conditions

    Outside: 25˚C/70%RH
    Inside: 20-30˚C*/40%RH

    Winter conditions

    Outside: -10˚C/70%RH
    Inside: 10-23˚C*/40%RH

    * pending manned/unmanned situation

    More information

    If you would like to get more information about our HVAC solutions for Offshore High Voltage Substations, please don’t hesitate to get in touch.

    contact us

     

    Read more

    Subsidiary
    Heinen & Hopman HQ
    Shipyard
    HSM Offshore
    Name
    OHVS Borkum Riffgrund 2
    Type
    Offshore High Voltage Substation (450 MW)
    Delivery year
    2018
    Country of Delivery
    The Netherlands
    Shared 0 times

    Certification

    iso9001.pngdnv-gl.pngrrr-2.pngbureau_veritas-2.pngrmrs-2.png
    Close
    Contact

    Contact

    All fields are required.

    Subscribe to our newsletter