Heinen & Hopman employee
closeHi, u bezoekt nu onze Engelstalige website voor de maritieme en offshore markt.
U kunt ook kiezen voor:
Utiliteit en ParticulierenWerken bij Heinen & Hopman
Staten Island Ferry
Outside35°cHumidity80%
22oInside
Provided byHeinen & Hopman
Our mission is to ensure you the perfect climate indoors, regardless of the weather outside.

HVAC | Staten Island Ferry

We are proud to announce our subsidiary LeBlanc & Associates, LLC was awarded the contract to supply the climate control systems for the passenger, crew and machinery spaces for a ferry, to be built by Eastern Shipbuilding Group for the New York City Department of Transportation (NYC DOT).

Increasing ferry ridership in NYC

The 5.2 mile route from Staten Island to Manhattan Island is operated 24 hours a day, every day of the year and serves over 22 million passengers annually. New York City ferry ridership is expected to increase continually into the foreseeable future as both recreational activities on Staten Island and commuter traffic into the city are expected to continue to grow. The new Ollis Class Ferry will be built to meet this increasing demand. Moreover, the Ollis Class Ferry design incorporates the latest regulatory and environmental requirements.

staten-island-ollis-class-ferry2.jpg

Maximize heat recovery performance

LeBlanc & Associates, LLC will deliver the machinery ventilation and heating, passenger and crew space HVAC, a tempered water system and deck de-icing. An engine waste heat recovery system will be used to support the vessel heating load. The challenge will be to integrate the engine waste heat recovery system with the tempered water system to maximize heat recovery performance while controlling weight and equipment cost. VFD’s will be installed in the passenger space air handlers to adjust heating capacities and outdoor air quantities for varying passenger loads, resulting in higher energy savings.

Design conditions

The following design conditions were considered for the design and engineering of the systems:

Outside-Inside Summer

Outside: 34ºC/42%R.H.
Inside: 24ºC/50%R.H.

Outside-Inside Winter

Outside: -/-11ºC
Inside: 21ºC

More information

Would you like to know more about our HVAC&R solutions for ferries? Don’t hesitate to get in touch!

Contact us

 

Picture by Fletcher6 (Own work) [CC BY 4.0], via Wikimedia Commons

Read more

Subsidiary
LeBlanc & Associates, LLC
Shipyard
Eastern Shipbuilding Group
Name Vessel
MV Michael H. Ollis (+ 2 others)
Owner
New York City Department of Transportation (NYC DOT)
Delivery year
2019
Country of Delivery
United States of America
Vessel type
Ferry
Length
320 ft (97,5 meters)

The challenge will be to integrate the engine waste heat recovery system with the tempered water system to maximize heat recovery performance while controlling weight and equipment cost.

Arjen van Diermen

Arjen van Diermen

Arjen van Diermen

- Project Manager

Arjen van Diermen

Arjen van Diermen

- Project Manager

Certification

Stay updated

Subscribe to our newsletter

Close
Contact

All fields are required.

Get a quote for an HVAC system

File (optional)
Close
Can't find what you're looking for?

We probably offer a HVAC&R system that suits your specifc needs!

Close
Can't find what you're looking for?

We probably offer a service that suits your specifc needs!